You can also stake out by using angle, distance and height by selecting "HDh." It's a step by step guide in which yo. Either laser or analog plummets are utilized for final centering within a point. The line would turn westward again, coming to the surface just west of Strachan Avenue on the north side of the railway corridor along Exhibition Place, before arriving at Exhibition station, its southwestern terminus. Data transfer and conversion. The program With the aid of trigonometry, the distances and angles may be utilized to calculate the real positions (x, y, and z or northing,) of surveyed points in total terms. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. F4 . Their importance in the last few years is seen to be steadily increasing. Ranges of reflectorless total stations are given relative to 90% and 18% Kodak grey cards and may vary from 300 feet to over 3000 feet. If the coordinates are incorrect, press the "No" button to try again. Speed: Not only is a RTS serving as a tool for accurate concrete layouts, a robotic total station also offers the advantage of speed. The provincial government claimed that the higher estimate was due to inflation and supply issues. Use the locking knobs on the side of the theodolite to keep it aimed on the point. Point number (you may want to use different point-numbers for the station points and topo points) Target height (for prism pole shots measure from the ground to the centre of the prism Code (depending on what your software does with it, e.g. Stable data communication with long-range Bluetooth (up to 400m) ATRplus technology, maximising the total station's ability to remain locked on your target for highest point-to-point layout speed. By December 2020, the completion date had been revised to 2030. You can store the stakeout point. [71], The portal to the tunnelled portion of the line will be just east of the station platforms. The This process is very useful for people who stakeout from a . Atotal stationis an optical instrument used in modern surveying. Total station set up. After the position of the total station was identified, the 12 points of the specified building positions assigned were added in the data collector and then staked out. The main pieces ofsurveying equipmentinusearound the world are the following: theodolite, measuring tape, total station, 3D scanners, GPS/GNSS, level and rod. Parts of a total station. Set within a 20-minute walking distance from Rogers Centre, the hostel gives quick access to a bus stop in Downtown Toronto district. Select . Get the necessary materials ready (i.e. [60][61], In February 2023, Metrolinx cut down 61 trees to prepare the station site for construction. Decades of experience automating mine surveying plus proven results make NSS the ideal partner for Hexagon in our efforts to serve Underground customers in the US and Canada. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. This 3-day course comprises days 3-5 of the 5-day course, Setting Out For Construction. This infor-mation and the GNSS data are either post-processed at the survey office or calculated in real-time on site. We help brands optimize their online presence & performance. Metrolinx said that the original completion date was based on market conditions that since 2019 had changed dramatically. Escalators, elevators and interior corridors will be available to facilitate transfers. Make sure that the total station is level and on secure, even ground before continuing. . The following are some of the major advantages of using total station over the conventional surveying instruments : Field work is carried out very fast. Distance, gradient, difference in height between two inaccessible points using total station 14. 9. Press F4 OK. 8. Providing reliable, accurate and innovative mining and survey equipment Angle Distance Stakeout Use known angle and distance to do angle distance stakeout Coordinate Measurement This program can record the detail information of angle . The line would jog south to Overlea Boulevard and then jog west on the north side of that street on an elevated structure. In the case of traversing or other control survey functions, the servo drives can be used to point the instrument in the direction of the next target of the observing program, requiring only fine pointing adjustments by hand. Utilization of a fixed height pole helps reduces HR blunders. Metrolinx proposes using mitigation strategies involving "systems, maintenance and track design" to reduce noise and vibration, and new community spaces and parks "to offset (the) visual impact and footprint of the elevated structure". Total Station Vertical and Horizontal field check NEI This manual contains important safety directions as well as instructions for setting up the product and operating it. Tip. The city preferred that space be taken from the northbound lanes on University Avenue, but Metrolinx said building a shaft there would conflict with Line 1 running below. [46], Originally named Leslieville, RiversideLeslieville will be located on the railway bridge over Queen Street East on the boundary between the Riverside (west side) and Leslieville (east side) neighbourhoods. Ontario Line riders will be able to transfer to a 501 Queen or 510 Spadina streetcar at surface stops without having to fully cross a street. [46], East Harbour station will be an intermodal station with GO Transit trains and will be located between Eastern Avenue and the Don River along GO Transit's Lakeshore East / Stouffville rail corridor. Focus and plate management tangent and locking screws vary widely between total station brands. Enter the coordinates of the point that you want to stake out (which the device should do automatically). Toronto Union Train Station | Map & Adress - CANADA TRAINS Press the "Select" button to enter the stake out menu. Other stations have connections to Toronto Transit Commission streetcar and bus services. Metrolinx would help relocate businesses within Thorncliffe Park. Continuing west on the other side of the valley, the line would pass the Ontario Line maintenance and storage facility. Chris has written for the "Fulton Sun" and eHow, focusing on technology and sports. SME MINEXCHANGE 2023 February 26th March 1st, NSS CANADA1351 E Unit #10, Kelly Lake Rd.Greater Sudbury, ON P3E 5P5, CAD/US Toll Free:+1 800 461 3223Telephone:+1 705 744 3246, 2023 NSS Canada | Leica Geosystems AG Part ofHexagon. Consequently, Union Station is Via Rail's busiest and most visited station by far. Figure 15-2B Hand Written Generated Slope Stake Notes There are various ways to slope stake a project, depending on which method you choose. Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300+ The Trimble S Series DR 300+ is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources Setting Out How To Use A Total Station Stakeout Program Step By Step A practical exercise will be conducted after the classroom training to give participants experience with the use of the Total Station and some position principles. Step 4. In this webinar recording, you will learn how to use MAGNET Field standard features to utilise CAD data in a simple . The line will pass diagonally under the southeast corner of the intersection. The facility would store 200 trains and have a maximum capacity of 250. Contents Standard measurements. Fortunately its a rare situation :) https://amzn.to/3nawPeN https://amzn.to/3yhMMWMGLOVES - I got them first on one of the jobs and I use only these from then https://amzn.to/3bvldjCIMPORTANTSome links in the description may contain one or more affiliate links for items mentioned in my videos - the items I personally use and recommend. The Ontario Ministry of Transportation (MTO) released the Connecting the GGH: A Transportation Plan for the Greater Golden Horseshoe to provide a 30-year vision for enhanced mobility within and across the Greater Golden Horseshoe (GGH), including future expansion plans for the Ontario Line. Ltd. All Rights Reserved. The program Copyright 2016 Skyfi Education Labs Pvt. https://youtube.com/watch?v=2GCCaKlxmAU, Controlling Vertical Towers w3.leica-geosystems.com. There is also a future proposal to extend streetcar service south along Broadview Avenue into the Port Lands in the vicinity of East Harbour station. The Ontario Line is an under-construction rapid transit line in Toronto, Ontario, Canada. Chris earned Bachelor of Arts degrees in journalism and English from Truman State University. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. [27] The City of Toronto's Relief Line proposal was expected to use existing heavy-rail rolling stock that is also used on Lines 1, 2, and 4. Semiautomatic Total Stations The user needed to manually read the horizontal circle for all these instruments, but the vertical ring readings have been displayed. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. Fig.1: Example plan to be set out on the ground. 7. Again, because of the servo-driven design, the limit stops of the fine motion screws no longer can exist. This is done by using motors to aim and position the instrument. ence station and a total station are set up. A total station theodolite is an electronic/optical instrument used for surveying and building construction. Analog or digital tape measures are often used for measurement of smaller distances. Get Traffic & Exposure. Digital panel: Displays the values of distance, angle, height and the co-ordinates of the observed point, where the reflector (target) is kept. Total Station and Automatic Level; however may over look the importance of the tripod, prisms and staffs employed in accurately measuring and setting out. When you see the home screen, press the "Menu" button and use the navigation arrows to move down to the "Stake Out" menu option. [50], In 2019, Metrolinx was considering a means to link Exhibition station to Ontario Place to the south. The Ontario Line station will have centre platforms and two entrances. This manual contains important safety directions (refer to section Safety directions) as well as instructions Stake out using total station 13. When classical terrestrial surveying methods are used in staking out of highway construction projects one can meet with some difficulties such . PDF Chapter 9 Total Station System (TSS) Survey Specification Mapping and stake out. Total Station Topo Survey Pro. Riders can also transfer to the 509 and 511 streetcars at Exhibition Loop. Total Stations Weebly What is Setting Out/Stake out? In the case of setting out, it makes it feasible to set control points for surveying with very little sighting through the telescope. You will learn how to mark a point which is the basic knowledge for a site and setting out engineer.JOIN the best engineering community SUBSCRIBE NOW!!! SITENG - Setting Out #7 "Stakeout" In today's video I am showing how to use the Stakeout program using a Total Station. You can participate in any of the Civil Simplified workshops including SConstruction Project Management, Building Information Modeling (BIM), Bridge Design, Fabrication & Testing, Tall Buildings Design, Seismic Design of Buildings, Foundation Engineering and Analysis, Survey Camp using Total Station, Applications of GIS, Transportation Engineering, .Civil Simplified offers the best quality training programs in India designed by IIT graduates. Every construction project relies on accurate measurements and the Total Station is one of the most important pieces of surveying equipment used in the industry today. [45][42][47][48], The Ontario Line will serve Science Centre station at Eglinton Avenue, providing a connection to Line 5 Eglinton. Please visit https://www.skippertech.com/total-station/, At Scondesign,we are providing best Total station Survey companies in bangalore which is used in modern suveying.we are using a best equipments for surveying you can call us at +(91)8296698585. Find out What is a Total Station? Affiliate links are primarily Amazon.#civilengineering #siteengineer #constructionuk Site clearance. #4 of the top-rated hostels near Union Station, Toronto. Most of the proposed stations on the Ontario Line will facilitate transfers between other forms of public transport, and the majority will provide transfers to other rail-based transportation (GO Transit, TTC subway and streetcar). A total station is an electronic/optical instrument used in modern surveying and building construction that uses electronic transit theodolite in conjunction with electronic distance meter (EDM).It is also integrated with microprocessor, electronic data collector and storage system. It will also stake out the centerline itself. To fully understand the use of surveying instruments, take a course from a licensed surveyor. Stake-out without coordinates data! Step 5: Continue to Level and Adjust the Tribrach As Necessary. Also, read: First Angle Projection & Third Angle Projection Symbol (Orthographic Projection). This discussion provides general guidance on the use of total stations on topographic surveys. Press F2 (Stake Out). SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. Angle-distance method to stake out the horizontal alignment by total Read carefully through the User Manual before you switch on the product. In this video we demonstrate how to stake to a reference alignment. + Measurement using CL or CL and CR (circle left & circle . The trees were about 70 years old. Boost accuracy and speed when performing volumetric surveys, including overbreak and underbreak comparisons. Professionalism is something sometimes overlooked, but NOT with these guys. Introduction This Total Station Training Manual is intended to help you understand and get the most out of the Sokkia Total Station that you have chosen. Press CONT by using the F1 key. According to Metrolinx, the new line will do more than provide relief to overcrowding on Toronto's existing subway system: it will provide new connections to the communities of Flemingdon Park and Thorncliffe Park. The setup you are deleting is selected in the . However, Save TPARK, a neighbourhood group, opposed the proposed location of the MSF as an unwelcome encroachment on the neighbourhood; it wanted Metrolinx to choose another location and offer the community more affordable housing. important if you are to use sophisticated Total Stations and Electronic Distance Measurers (EDMs) only by understanding the underlying concept will you understand what you The line would then enter Gerrard station on an elevated structure over the intersection of Gerrard Street and Carlaw Avenue. Calculation of coordinates is very fast and accurate. The elevated structures may have a greater environmental impact with respect to noise, vibration and visual presence than with an underground right-of-way. The Ontario Line platform would be on an elevated structure above Science Centre station's bus terminal, located north of Eglinton Avenue on the east side of Don Mills Road. Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . Posted by : admin On : October 24, 2020. Once it has been properly calibrated, you can use the total station to stake out points. [72], Exhibition station will be located on the north side of Exhibition GO station along GO Transit's Lakeshore West rail corridor. Control points established by resection methods are adjusted for horizontal position by least squares before they are used in the field. While holding the tripod, loosen the tripod leg clamps and extend the tripod up to a height near your neck and chin. It may be challenging to fit the Ontario Line along GO Transit's. Any point pertaining to a project may be located on the ground and on the plans by itsStationand the number of feet (Offset) LEFT or RIGHT of theSurveyC/L. The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. [71][72], KingBathurst station will be located at the intersection of King Street West and Bathurst Street. 1 How to Set Up Builder to Gain a Known Station 16 1.1 Set Up Anywhere Based on Given Control Line 16 1.2 Set Up over Control Line 18 1.3 Set Up Anywhere with Given Coordinates 20 1.4 Set Up over One Known Point with Second Known Point 24 1.5 Set Up Using Nails from Profile Boards 28. [29] The deal was later approved by Toronto City Council in a 22 to 3 decision. 11. Continuing west on an elevated structure, the line would curve south over Millwood Road across the Don Valley on a new bridge roughly parallel and west of Leaside Bridge. How to use a total station steps are as follows. TPS02 06 - Survey machine manual - Starting the Survey Using TS 06 Plus When starting a construction project, it is important to know the layout of the area in which you are working. That is, the exact length, width, depth, and position of the foundation trenches must be marked on the ground. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. stakeout | Leica Total Station Set up is similar in many ways to the set up technique explained earlier when surveying with the total station setup over a known station. The course will involve a classroom session covering the principles and an introduction to the Total Station. Here is how to use a total station for this type of action: Position the device at a known point by setting the horizontal circle. Otherwise, use the following settings to create your own setting and to save it. One entrance will be at the northeast corner of Queen Street and University Avenue. In the mid-2010s, the City of Toronto developed plans for this line, known as the "Relief Line South",[a] between Pape station on Line 2 BloorDanforth and Osgoode station on Line 1 YongeUniversity. All plummets, optical or electronic, should occasionally be checked, adjusted, and calibrated. Once the site is prepared, a tunnel-boring machine will launch north and west from the site while another launches south and east towards the Don Yard. leave the THUMBS UP!!! Metrolinx hired Schabas in December 2018 to lead a team to transform the Relief Line plans into the Ontario Line. A total station is an electronic/optical instrument used in modern surveying. [52] The government also claims the alternate technology will reduce construction time and cost, as single tunnels rather than dual tunnels could be utilized. If not you will need to return to the main menu and select the Tap Here to choose Design Data to the far left of the job carousel. History of construction surveying. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. Stakeout a surface model exported from AutoCAD Civil 3D. When these instruments are used manually, because they are servo-driven, they have friction clutches that afford great speed in point, as there are no locks to be adjusted. Setting out stake-out values 2.5.2.1.Angle 2.5.2.1.Angle & Distance stake-out stake- will To go through the angle & distance is done . Programs and functions are different from one brand to the other, but most of Total station field techniques. For most programs, a retro-reflector prism is attached to the top of the. Tail tracks will extend west of the platforms to Dufferin Street for storing and turning back trains and a possible future extension. Advantages of Using Total Stations. For 2-D stakeout, the number of the stake point is entered, the instrument will display differences of angles and distances to orient the prism. In this example we will stake-out offsets from a Line. At University Avenue, the Ontario Line will run under Queen Street and cross under Line 1 at the station. Extract and relate coordinate information from drawings. Solve surface and UG challenges with proven technologies for planning, operations, and safety. [7][8] As of November2022[update], the estimated cost for the 15.6-kilometre (9.7mi) line was CA$17 to $19billion with an estimated completion in 2031. [citation needed]. But Ford himself is cause for skepticism", "Ontario unveils $28.5-billion transit plan, vows to double length of Toronto's downtown relief line", "Ford transit plan like 'Groundhog Day' for waterfront: Coun. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. The Ontario Line would cross the Don River on a new bridge located on the north side of the existing rail bridge. Total Station Vertical and Horizontal field check NEI, Basics Laying out Trenches and Levelling BAJR, https://youtube.com/watch?v=iRH6bOMdBq4 [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street. Results showed that positioning accuracy of 1-3 cm was generally achieved. An entire station is a combination of a digital theodolite, an electronic distance measuring device (EDM) and a microprocessor with a memory unit. How To Stake Our Points Staking out points is one of the most common uses for a total station. Use of Sokkia SET 4BII Electronic Total Stations Various techniques and instruments are used for this process of setting out. Therefore we will assume that you can follow the steps outlined above in earlier sections for instructions on setting up the total station [54] There are plans for an additional station entry directly from Danforth Avenue. Left, bottom: According Connor Smith, setting up a total station and running checks on the jobsite takes almost as long as laying out the pointsabout 30 minutes for setup and layout work on the average project. The contracts are:[31], On June 2, 2020, Infrastructure Ontario (IO) and Metrolinx issued a request for qualification (RFQ) for rolling stock, systems, operations and maintenance (RSSOM), marking the first phase of procurement for the Ontario Line. Inspecting the EDM of the total station 23 Instrument errors in the total station 24 Simple surveying tasks 26 Aligning from the mid-point 26 Measuring slopes 27 Measuring right-angles 28 Applications programs 29 Calculating areas 29 Staking out 30 Remote heights 31 Tie distances 32 Free-station surveys 33 The applications programs available 34 This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3 . Step 3: Set-up the Tripod. Using Real Time Kinematic (RTK) for construction staking is effective, and allows for real-time information and positioning so that the surveys and stake placement can be as accurate as conventional land surveying and done in less time. Coordinate calculation. Total Stations. Use and operation of external and internal data collectors using a total station are covered. It is probably the most critical step in the entire construction process. [34] On November 9, 2022, Metrolinx and Infrastructure Ontario awarded the contract to Ontario Transit Group, a consortium including Ferrovial, VINCI, AECOM, GHD, among others, with a projected completion date of 2030.[35]. https://youtube.com/watch?v=iGRQqQ5UDXg After crossing the river, the line would pass the GO Transit Don Yard before descending into a tunnel just east of Cherry Street. Advantage & Disadvantage of Total Station, #4. The program Computers can be employed for map making and plotting contour and cross-sections. The tribrach is about centered over the point first utilizing the standard tripod leg modification technique. Control points established by resection methods . Station entrances will be located at the northeast and southeast corners of the intersection. The elevated Ontario Line station will have a centre platform and two entrances. Queen station already has seven entrances, including some in the Toronto Eaton Centre and at the Hudson's Bay Queen Street complex, and no additional entrances are planned. 50 mm s 1, 200 mm s 1, and 500 mm s 1.For these measurements, the TS was placed in the same line as the AB line (Fig. Ensure that the ground is flat and the tripod stand is firmly established on the ground. When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. 8.0. It will be located under the west side of Pape Avenue so as to avoid digging up Pape Avenue itself during construction. Stake out using total station - ljx.cryptodemokrata.pl Safer, smarter, and more efficient mining. Furthermore, fine pointing is aided by having unlimited travel in the tangent screws. Spread out the tripod legs evenly, about two to three feet for each leg, and center it over your benchmark stake. 7) Saving on setups. Metrolinx plans to rebuild the bridge over Queen Street in order to have it rise 5 metres (16ft) over street level instead of the current 3.9 metres (13ft). . Additional things to be considered in the range of a particular total station include robotic search controllers, measurement time, integrated laser scanners, integrated GPS, internal digital camera, internal data storage capability, inner COGO and stakeout capacities.